RIDE DETAILS
Ride Host: Kris Yost
Cell Phone#:
Name of Ride: Mt Diablo - Celebrate the Opening of North Gate
Date and time of the ride: Thursday, Jan 12
Starting location: Arbolado Park, 3600 Arbolado Dr., Walnut Creek
Estimated Mileage: 25 mi with 3400' climbing
Ride Rating & Elevation: 4-5 M
Short stop at Junction and Summit
Park and meet in parking lot of Arbolado Park. There are restrooms at the park. This is an out and back route so each rider can ride as far as they wish at their own pace before turning around for the descent back to the parking area. Descent may be cool and each cyclist should consider bringing additional layers to put on for the downhill.
Link to the ride ‘turn by turn’ instructions (Ride with GPS)
https://ridewithgps.com/routes/40280464